The following steps are required before opening the automobile dismantling business.

1.Confirmation of contents such as planned site, meeting

While listening to the customer's request, we will confirm the contents of the planned site and have a meeting to create a plan.

2.preliminary survey

We will investigate whether it conforms to the standards of the automobile dismantling business permit and whether it is consistent with the land use plan.

3.Creation of drawings and plans

If it is possible to plan by the preliminary survey, we will create drawings of the offices and equipment.

* If you need to apply for development permission, etc., we will do it after STEP 3.

4.On-site construction starts

Based on the drawing, we will start building the office. If you need to apply for development permission etc., we will apply before the start of construction on site.

5.On-site inspection

We will inspect after construction whether it meets the standards and whether the equipment required for application is in place.

6.Permission application

After confirming that the on-site inspection has been completed and there are no problems, we will apply for this application.

Preliminary survey fee request ¥ 50,000 will be incurred.
1.Confirmation of contents such as planned site, meeting
We will confirm the planned site to start the business and explain the necessary application fee.
Preliminary survey fee request ¥ 50,000 will be incurred.
2.preliminary survey
At this point you will know if you can plan.
If it is not possible to plan, it is necessary to change the planned site.
* In some cases, a current survey may be required.
In that case, a separate quote will be provided.
A book creation fee of 100,000 yen will be charged.
3.Creation of drawings and plans
According to the content of the meeting, we will create a drawing of the business plan site and a plan for equipment installation.
A book creation fee of 100,000 yen will be charged.
If necessary, we will quote separately.
Cases where application is required
Development permission application
Agricultural land conversion
Building confirmation
If necessary, we will quote separately.
We will charge the cost of application for development permission and conversion of farmland before the construction starts.
4.On-site construction starts
We will start building the office based on the drawings and plans.
If there is an application such as development permission, construction will start after the application is completed.
We will charge the cost of application for development permission and conversion of farmland before the construction starts.
5.On-site inspection
We will inspect after construction whether it meets the standards and whether the equipment required for application is in place.
This application fee will be charged ¥ 10,000.
6.Permission application
This application will be made after the on-site inspection and prior application are completed.
As soon as the payment of this application fee is confirmed, we will submit a permit application to the prefectural governor.
This application fee will be charged ¥ 10,000.

Please feel free to contact us regarding permission to dismantle a car.

We support complicated procedures and document preparation for those who are thinking about the automobile dismantling business and those who are about to start the business.